Argonath RPG - A World of its own

GTA:SA => SA:MP - San Andreas Multiplayer => SA:MP General => Topic started by: Teddy on June 29, 2015, 09:31:22 pm

Title: Digital Era: Phase 1: Setup & Preparation
Post by: Teddy on June 29, 2015, 09:31:22 pm
The digital era updates (http://www.argonathrpg.eu/index.php?topic=112231.0) will be performed differently than most updates as in the player's involvement will be required to progress phases and actually work to deploy networking services to the state.

With that said we're ready to begin preparing phase 1 which will require the electrical grid to also be upgraded to support a new connectivity: internet. Players will need to purchase parts at Ocean docks (far back & far right warehouse), you'll need a Utility vehicle, and then transport these parts to different electrical substations and the Big Ear satellite so the state can become ready to support an internet infrastructure.

Commands
/getnodepart - Purchase 1 node part for $1,000
/setupnode - Use a node part to prepare the node line. Each node requires 30 parts, satellite stations require 50.

Once all stations and nodes are online, we can transition into the next phase of digital era.

You will be paid $2,000 per node upgrade ($1k profit).
Title: Re: Digital Era: Phase 1: Setup & Preparation
Post by: Kostas on June 29, 2015, 09:42:39 pm
Interesting.
Title: Re: Digital Era: Phase 1: Setup & Preparation
Post by: Mr. Goobii on June 29, 2015, 09:56:37 pm
I love the idea, though I hope it become simple enough for everyone to acknowledge!

Great work Teddy! :)
Title: Re: Digital Era: Phase 1: Setup & Preparation
Post by: Teddy on June 29, 2015, 10:03:19 pm
for reference: this is an electrical substation:
(https://upload.wikimedia.org/wikipedia/commons/c/c0/Substation,_Smeaton_-_geograph.org.uk_-_19712.jpg)
Title: Re: Digital Era: Phase 1: Setup & Preparation
Post by: AK47 on June 29, 2015, 10:12:10 pm
interesting indeed
Title: Re: Digital Era: Phase 1: Setup & Preparation
Post by: Plam_Knight on June 30, 2015, 06:50:34 am
SAPD will assist by providing police convoys to multiple transport drivers in order to get this system up and running as fast as possible
Title: Re: Digital Era: Phase 1: Setup & Preparation
Post by: Manoni on June 30, 2015, 07:22:18 am
All the stations have the required nodes and are online already.
Title: Re: Digital Era: Phase 1: Setup & Preparation
Post by: Allison on June 30, 2015, 07:36:24 am
All the stations have the required nodes and are online already.
The Tierra Robada substation near the highway and by the sea still has a ways to go. One of them is currently at 0/30 nodes set up, while the other has around 10/30.
Title: Re: Digital Era: Phase 1: Setup & Preparation
Post by: Manoni on June 30, 2015, 07:42:21 am
I thought we only had three stations. Oh well, I guess I'll go to help finish later.
Title: Re: Digital Era: Phase 1: Setup & Preparation
Post by: TiMoN on June 30, 2015, 10:16:50 am
That's a great way to begin an update, :app:
Title: Re: Digital Era: Phase 1: Setup & Preparation
Post by: Dylan on June 30, 2015, 10:35:15 pm
The Tierra Robada substation near the highway and by the sea still has a ways to go. One of them is currently at 0/30 nodes set up, while the other has around 10/30.
It's online now; I assume that all the stations are online now?
Title: Re: Digital Era: Phase 1: Setup & Preparation
Post by: Bruce. on June 30, 2015, 10:38:42 pm
Willowfield - Las Venturas behind the strip club - Big Ear - Missionary Hill - Tierra Robada  this are all done. If I forgot any tell me and Teddy if there are more then this tell us that is more but don't say the location :D
Title: Re: Digital Era: Phase 1: Setup & Preparation
Post by: Allison on June 30, 2015, 10:47:43 pm
It's online now; I assume that all the stations are online now?
Yep, I believe so.
SimplePortal 2.3.7 © 2008-2025, SimplePortal